News in English     | 12.01.2025. 15:55 |

Bajramović: BiH power network can support 2,000 MW from new plants

FENA Darinka Mitrović, Photo: Archive

SARAJEVO, January 12 (FENA) - The distribution and transmission network in Bosnia and Herzegovina can accept electricity generated by new power plants with a total capacity of 2,000 megawatts (MW), which are planned to be built in the coming years. These include hydropower plants on the Bosnia and Drina rivers, projects of exceptional importance for the ongoing energy sector transition.

Sadržaj dostupan isključivo pretplatnicima FENA servisa. Za više informacija o načinu i uslovima korištenja servisa kontaktirajte marketing@fena.ba.

(FENA) A. B.

Vezane vijesti

Bajramović on implementation of CBAM mechanism: Costs should be turned into income

The countries of the region are strengthening cooperation in the power sector

Bajramović: The energy transition requires new knowledge and new workers

Promo

Samsung Galaxy S25 serija postavlja standard AI telefona kao pravog AI saputnika

United Grupa ulazi u proizvodnju obnovljive energije u Bugarskoj

Obuka za CNC operatere u Interi